Master plumbers on construction jobs may be involved with developing blueprints that show the placement of all the pipes and fixtures. Their input helps ensure that a structure’s plumbing meets building codes, stays within budget, and works well with the location of other features, such as electric wires. Many diagrams are now created digitally with the use of Building Information Modeling (BIM), which allows a building’s physical systems to be planned and coordinated across occupations.
I was disappointed with the pressure of a tub and shower that were plumbed with 1/2 supply lines (2nd floor). Could be low pressure from the street, but I want to replace with 5/8. Plus, I'd like to have 2 back to back showers, one inside and one outside. So, I had intended to bring a 1 supply to both, then branch up to valves and shower head with 5/8. Finally, I thought pressure from the street was typically 55 to 70 psi and I am concerned if pvc can take that.Any thoughts?
I was disappointed with the pressure of a tub and shower that were plumbed with 1/2 supply lines (2nd floor). Could be low pressure from the street, but I want to replace with 5/8. Plus, I'd like to have 2 back to back showers, one inside and one outside. So, I had intended to bring a 1 supply to both, then branch up to valves and shower head with 5/8. Finally, I thought pressure from the street was typically 55 to 70 psi and I am concerned if pvc can take that.Any thoughts?

Rooter Plumbing

×